Quick Answer
Decarbonisation in hard-to-abate operations should combine immediate efficiency and material improvements with preparation for deeper process changes. Separate fuel, electricity and process emissions, identify feasible reductions and assess cleaner heat, alternative inputs and carbon capture where appropriate. Difficult production chemistry does not make every emission source equally difficult to address. IEA
Consider a hypothetical UAE cement producer postponing every carbon project until capture technology becomes viable for its site. The larger process challenge remains, but so do avoidable energy and material losses.
The better approach is to work on both timelines: improve existing operations while preparing the investments needed for deeper reductions.
1. Identify What Makes the Operation Hard to Abate
High-temperature processes, emissions from chemical reactions and long-lived equipment can make substantial reductions difficult. Steel, cement and chemical production require different solutions; the sector label is not a complete diagnosis. The Department of Energy's Energy.gov
Separate combustion, purchased electricity, process emissions and significant value-chain sources. For each, record whether the constraint is technical, financial, contractual or infrastructure-related.
Build this assessment on a credible inventory. elementsix’s carbon footprint and GHG accounting services support identifying sources before reduction measures are prioritised.
2. Improve Energy Performance Without Waiting for Major Replacement
Review process controls, insulation, motors, pumps and compressors. Assess heat recovery where another process can use the recovered energy. The IEA identifies technical efficiency, material efficiency and process optimisation as important near-term industrial measures. IEA
Ask engineering teams which improvements fit the next maintenance shutdown and which can proceed sooner. Test costs and savings against actual operating conditions; do not assume every retrofit has a short payback.
Efficiency is a starting point, not evidence that the plant can avoid larger changes indefinitely.
3. Reduce Material Losses and Review Product Specifications
Lower reject rates and better material yields mean less input is needed for saleable output. Investigate scrap recovery and appropriate recycled inputs rather than looking only at fuel consumption. Material efficiency and increased scrap use are established industrial reduction measures. IEA
For cement, reducing the clinker proportion can lower emissions, but suitable substitutes must be available and meet product requirements. Local standards and intended applications constrain substitution. IEA
For UAE manufacturers, involve procurement and customers early: a technically workable alternative still needs specification approval and dependable supply.
4. Electrify Suitable Duties, Not Necessarily the Whole Plant
An operation with a difficult high-temperature core may still have lower-temperature heat requirements suitable for heat pumps or electric boilers. Assess these duties separately rather than rejecting electrification for the entire site. IEA
Check temperature, load profile, connection capacity, reliability, electricity emissions and tariffs. The IEA highlights that connection costs and relative electricity and fuel prices can materially affect industrial heat economics. IEA
For a UAE industrial estate, confirm upgrade requirements with the utility or estate operator before approving equipment. Moving emissions from fuel combustion to purchased electricity is not automatically a net reduction.
5. Prepare Hydrogen and Carbon-Capture Options Carefully
Develop feasibility studies alongside near-term action, not after every efficiency project is complete.
For hydrogen, request quantified production emissions rather than relying on a colour label. The IEA recommends emissions-intensity definitions because colour terminology does not provide sufficient contractual clarity. IEA
For carbon capture and storage, assess the whole chain: capture equipment, additional energy, transport, storage access, monitoring and commercial responsibilities. A capture unit without a credible storage route is not a complete project. Shared infrastructure may help, but availability and access must be established for the specific site. The Department of Energy's Energy.gov
6. Protect the Next Major Investment Decision
Compare immediate improvements with options for the next furnace refurbishment, production-line replacement or plant expansion. Do not extend an asset’s operating life without considering how it fits the longer-term emissions pathway.
For each option, record expected reductions, capital requirements, shutdown implications, dependencies and a decision date. Use pilots to resolve specific uncertainties before full investment approval.
The elementsix carbon-management advisory team can help connect emissions assessments with practical reduction roadmaps. Engineering design, safety approvals and technology guarantees still require appropriately qualified specialists.
First-Stage Decarbonisation Checklist
Separate energy-related and process emissions.
Fund feasible efficiency and material improvements.
Assess electricity, fuel and storage dependencies.
Assign owners and decision dates to larger projects.
Verify savings against comparable production conditions.
Frequently Asked Questions
What does hard-to-abate actually mean?
It describes activities where substantial emissions reductions face technical or economic barriers, such as high-temperature requirements, process chemistry and long-lived assets. It does not mean that every source at the facility is equally difficult to change. Assess individual processes before deciding which reductions require longer-term solutions. The Department of Energy's Energy.gov
Can renewable electricity eliminate cement emissions?
No. Conventional cement production also releases CO2 through the transformation of carbon-containing raw materials. Cleaner electricity addresses only part of the footprint. Energy efficiency, material substitution and solutions for remaining process emissions must be evaluated separately rather than presenting renewable procurement as complete plant decarbonisation. IEA
Is electrification always the best first project?
No. Suitability depends on the process temperature, equipment, electricity supply and operating economics. Lower-temperature duties may offer earlier opportunities than a core high-temperature process. Compare alternatives using the site’s actual conditions, including connection costs, rather than assuming electricity is automatically the cheapest or lowest-emissions option. IEA
Should a company wait until carbon capture is available?
Do not postpone feasible improvements solely because a larger solution is unresolved. Run efficiency projects and major-technology studies in parallel, with separate owners and milestones. At the same time, avoid spending on short-term upgrades that would obstruct or unnecessarily duplicate a planned deeper process conversion.
How should leadership judge early progress?
Track absolute emissions alongside energy and emissions per unit of saleable output. Record material yields, measured savings and progress on major investment decisions. A smaller footprint caused only by lower production is not proof of greater efficiency; explain changes in output and product mix before claiming success.
Start Where Progress Is Possible, Plan for What Is Harder
Hard-to-abate operations need a sequence, not an exemption. Deliver practical reductions now while resolving the engineering, infrastructure and commercial conditions needed for larger changes.
elementsix supports UAE and GCC organisations with GHG inventories, decarbonisation strategies and reduction planning. To assess priorities across your operations, submit a decarbonisation advisory RFP or contact elementsix at [email protected], DTEC, TechnoHub Building 1, Dubai Silicon Oasis, Dubai, United Arab Emirates.