Quick Answer

Prioritise energy efficiency projects using reliable consumption data, total ownership costs, achievable savings and emissions reductions. Separate essential works from discretionary upgrades, use payback for initial screening and assess lifetime value before major approvals. Test downside assumptions, consider asset-replacement timing and fund projects with clear delivery responsibilities and measurement plans.

The shortest payback does not always identify the best investment. A small control adjustment might recover its cost quickly, while a larger equipment upgrade delivers more savings over a longer period.

For a UAE business with limited capital, the task is to select a workable combination - not simply fund whichever proposal advertises the largest percentage saving.

1. Establish a Comparable Starting Point

Give every proposal a defined baseline: equipment condition, consumption, operating hours, output and service requirements. Distinguish optional improvements from essential replacements or safety-related work before ranking projects.

An investment-grade assessment should establish physical conditions and a savings-measurement approach before installation. Reconstructing the original baseline afterwards can be difficult. The Department of Energy's Energy.gov

elementsix’s carbon footprint and GHG accounting services help establish which energy sources contribute to the footprint before reduction opportunities are prioritised.

2. Compare Full Costs Against the Right Alternative

Include design, equipment, installation, commissioning, disruption, maintenance, monitoring and eventual replacement. Where equipment must be replaced anyway, compare the efficient option with a credible compliant replacement, not with spending nothing. Lifecycle analysis evaluates these alternatives beyond their initial price. The Department of Energy's Energy.gov

Hypothetical example: A required replacement costs AED 600,000. A more efficient option costs AED 720,000 and delivers AED 40,000 in additional annual net savings. The efficiency premium is AED 120,000, giving a three-year simple payback, assuming stable savings and no other differences.

The company still needs funding for the full purchase.

3. Use Payback to Screen Energy Efficiency Projects

For stable annual savings:

Simple payback = initial investment ÷ annual net cash savings

Payback does not capture the time value of money or benefits and costs after the recovery date. For significant investments, compare net present value - the discounted value of future net cash flows less the initial investment - and lifetime costs using finance-approved assumptions. Building Energy Codes Program

Model bill savings accurately. DEWA applies consumption slabs and a fuel surcharge, so savings should reflect the charges actually avoided, not a blanket percentage of the entire bill. Check each UAE site’s tariff and contract separately. DEWA

4. Rank Carbon Impact Alongside Financial Returns

Show annual energy savings and estimated tonnes of carbon dioxide equivalent reduced. Use emission factors appropriate to the energy source and location, documenting assumptions rather than applying one overseas factor across UAE sites. ghgprotocol.org

If management compares cost per tonne, use consistent project lifetimes, boundaries and cost treatment. Do not compare one proposal’s full capital cost divided by annual emissions reductions with another’s net lifetime cost divided by lifetime reductions.

Keep financial and carbon rankings visible separately. A project can be commercially attractive without addressing the company’s largest emissions source.

5. Test Downside Conditions and Delivery Constraints

Run a lower-savings case alongside the central forecast. Test reduced operating hours, higher installation costs, delayed commissioning and changed maintenance requirements. A proposal depending on perfect performance deserves further investigation before approval.

For leased premises, check remaining occupancy and who pays the energy bill. For production equipment, assess shutdown windows and operational continuity.

Agree these decision criteria before scoring projects. Treat customer, compliance or resilience benefits separately where they cannot be credibly expressed as cash savings. This is a recommended investment process, not a universal UAE approval formula.

6. Fund a Programme, Not a Disconnected List

Group projects into actions ready now, improvements aligned with planned replacement, and measures needing a pilot or further engineering. Reserve funding for monitoring and staff responsibilities rather than spending the entire budget on equipment.

After essential requirements are met, favour dependable savings, significant emissions impact and feasible delivery. Advance uncertain, potentially valuable projects to a pilot rather than automatically rejecting them or approving full investment.

Review interactions before approving combined savings, and adjust subsequent project forecasts when earlier measures change the baseline.

The elementsix carbon-management advisory team can help connect emissions priorities with practical reduction roadmaps. After commissioning, compare achieved performance with the investment case; forecasts are not verified savings. The Department of Energy's Energy.gov

Energy Efficiency Investment Checklist

  • Confirm the baseline, service requirements and alternatives.

  • Compare complete costs, net savings and emissions impact.

  • Test downside assumptions and delivery constraints.

  • Assign funding, owners and post-installation review dates.

Frequently Asked Questions

Is the project with the shortest payback always best?

No. Simple payback is useful for screening but ignores later savings, replacement costs and the time value of money. Assess the useful life, operating risks and longer-term value before selecting between major investments. A short payback alone does not establish the largest financial or environmental benefit. Building Energy Codes Program

Should replacement equipment be assessed using its full price?

Distinguish the funding requirement from the efficiency comparison. If replacement is already necessary, compare the additional cost and savings of the efficient option against a suitable standard alternative. For early replacement, include the consequences of retiring usable equipment rather than assuming that the same incremental calculation applies. The Department of Energy's Energy.gov

Can an energy service company help with financing?

Potentially. Dubai’s Regulatory and Supervisory Bureau publishes standard contracts for shared savings, where the energy service company finances the project, and guaranteed savings, where the client provides financing. Review fees, guarantees, measurement rules and risk allocation; financing support does not remove the need for a sound project assessment. rsbdubai.gov.ae

How should landlord and tenant projects be prioritised?

Confirm who funds the improvement, who receives bill savings and how long each party controls the premises. Where those interests differ, agree cost-sharing and responsibilities before approval. An attractive whole-building saving may not translate into a viable investment for the party expected to pay.

Should a business include an internal carbon price?

It can use one as an additional decision scenario if management defines the purpose and assumptions. Present the result separately from actual cash savings. An internal value assigned to emissions is not automatically a tax payable, a credit price or revenue the project will generate.

Approve Projects That Can Deliver Their Business Case

A sound investment programme balances cost, carbon impact and delivery confidence. Use quick-payback measures where suitable, but do not let a single metric exclude worthwhile long-term improvements.

elementsix supports UAE and GCC organisations with emissions assessments and practical reduction planning. To prioritise your energy efficiency opportunities, submit an energy-efficiency advisory RFP or contact elementsix at [email protected] DTEC, TechnoHub Building 1, Dubai Silicon Oasis, Dubai, United Arab Emirates. Pasted markdown


Dahlia Haleem
Written by

Dahlia Haleem

ESG Expert

Dahlia Haleem, co-founder and partner at elementsix, is an emission reduction expert with a strong background in physics and engineering. She has over 15 years of valuable experience in project management, strategic advisory, sustainability and carbon management across MENA and APAC.

View all articles by Dahlia