Quick Answer

Carbon offsetting should enter strategy discussions early, but a compensation claim needs a defined footprint, prioritised reductions and retirement of suitable credits. Companies can finance additional mitigation while decarbonising; they do not need to wait until every project is complete. Credits should supplement operational and value-chain reductions, not replace them. Science Based Targets Initiative

Consider a hypothetical UAE property business choosing between upgrading its cooling controls and purchasing carbon credits. The credits appear cheaper per tonne, so management considers postponing the equipment work.

That comparison misses the purpose of each investment. One changes the business’s consumption; the other finances mitigation elsewhere. The strategy needs room for both without confusing their results.

Establish the Role of Carbon Offsetting Before Procurement

Discuss credit use when setting the climate strategy, not only when marketing requests a carbon-neutral announcement.

First decide whether the objective is to compensate for defined emissions, contribute to additional climate action or meet a specific scheme’s requirements. These purposes require different eligibility checks and disclosures.

For compensation claims, establish the reporting boundary and period before determining a quantity. elementsix’s carbon footprint and GHG accounting services support this baseline and the identification of reduction priorities.

A proposed purchase should explain what it supports and what the business will continue reducing itself.

Do Not Treat All Remaining Emissions as Permanently Unavoidable

Current emissions may remain because equipment replacement takes time, suppliers need support or a technical alternative is not yet available. That does not automatically make them the residual emissions expected at a net-zero endpoint.

The Science Based Targets initiative (SBTi) distinguishes additional mitigation during the transition from neutralising residual emissions after deep value-chain reductions. Treat those as different planning questions. Science Based Targets Initiative

For each temporarily constrained source, record the obstacle, responsible team and review date. “Too expensive this year” should prompt a financing or implementation discussion, not permanent removal from the reduction programme.

Protect the Reduction Plan and Its Budget

Approve a practical reduction plan with project owners, milestones and funding before using credits to support a compensation claim. This is a recommended management control, not a universal legal spending formula.

For the hypothetical property business, keep the cooling-controls project on its delivery schedule. A separate credit budget can support additional mitigation without being counted as the saving expected from that upgrade.

Ask whether purchasing credits would delay maintenance, supplier engagement or equipment replacement already identified as necessary. A lower credit price is not, by itself, a sound reason to abandon those actions.

Additional Climate Finance Can Run Alongside Reductions

Prioritising reductions does not mean waiting until the company has eliminated every feasible source before financing mitigation elsewhere. SBTi encourages beyond-value-chain mitigation alongside the delivery of value-chain reductions. Science Based Targets Initiative

The Voluntary Carbon Markets Integrity Initiative (VCMI) similarly positions high-quality credit use above and beyond science-aligned emissions cuts. A climate-contribution statement is different from claiming that credits have cancelled the company’s footprint. VCMI

Define that purpose before selecting carbon credits and environmental commodities. Supporting an external project does not automatically justify a company-wide carbon-neutrality statement.

Approve the Claim After the Evidence

Procurement approval and claim approval should be separate decisions. Review project quality, suitability for the intended use and completed retirement before describing a purchase as offsetting.

Verra makes issuance and retirement records publicly available, allowing buyers to check the units used. Retain the project, quantity, beneficiary and relevant reporting-period information. Verra

Keep gross emissions visible. Under the GHG Protocol, Scope 1, Scope 2 and Scope 3 inventories are reported independently of credit transactions. If a company reports 10,000 tonnes of CO2e and retires 2,000 credits, the gross footprint remains 10,000 tonnes. GHG Protocol

The elementsix carbon-management advisory team can help connect inventory boundaries, reduction planning and environmental instruments before public wording is approved.

Review the Role Each Reporting Year

Revisit the credit policy when equipment changes, suppliers improve or new reduction options become available. A constraint accepted last year should not continue unchallenged.

Leadership should review reduction progress and credit use separately. If internal delivery slips, investigate the delay rather than increasing purchases to make the target appear achieved.

Before approving the next allocation, confirm:

  • The footprint and intended use are clear.

  • Reduction projects retain owners, funding and delivery dates.

  • Temporary constraints have review dates.

  • Credits and claims meet the selected framework’s requirements.

Frequently Asked Questions

Must a company finish decarbonising before using credits?

No. Additional mitigation can be financed while a company reduces its own emissions. The important distinction is priority, not waiting until every project ends. Keep internal targets and funding intact, and explain whether the credit use is a contribution or compensation for a defined footprint. Science Based Targets Initiative

Can offsets make up for a missed reduction target?

Not where the target requires reductions within the company’s operations or value chain. SBTi does not allow carbon credits to count towards its near- or long-term reduction targets. Disclose the shortfall, investigate its cause and report credit use separately rather than relabelling compensation as operational progress. Science Based Targets Initiative

How much of the climate budget should go to offsets?

Set the allocation after reviewing reduction needs, delivery constraints and the chosen claim or programme. As a budgeting principle, protect necessary decarbonisation expenditure and assess credit quality before deciding quantity. A percentage copied from another company is not evidence that the balance suits your business.

Does a project delay justify calling emissions unavoidable?

Not automatically. Identify why the project is delayed, whether alternatives exist and when the constraint will be reviewed. A lease restriction or equipment lead time may explain temporary difficulty, but it does not establish a permanent exemption from reduction. Keep accountability with the relevant operational owner.

Does buying enough credits mean the company is net zero?

No. Matching a footprint with credits is not equivalent to achieving the deep emissions reductions and neutralisation required by a net-zero framework. Define the claim, assess the applicable requirements and distinguish reductions from removals. A credit purchase cannot independently demonstrate the company’s transition to net zero. Science Based Targets Initiative

Include Credits Without Weakening the Transition

The right timing is not a single purchase date. Plan the role early, protect reduction delivery, and make claims only when the evidence is complete. That keeps carbon offsetting within the climate strategy rather than allowing it to become the strategy.

elementsix supports UAE and GCC organisations with emissions inventories, reduction planning and environmental commodities. To assess the role of carbon offsetting in your climate programme, contact elementsix at [email protected] DTEC, TechnoHub Building 1, Dubai Silicon Oasis, Dubai, United Arab Emirates.


Dahlia Haleem
Written by

Dahlia Haleem

ESG Expert

Dahlia Haleem, co-founder and partner at elementsix, is an emission reduction expert with a strong background in physics and engineering. She has over 15 years of valuable experience in project management, strategic advisory, sustainability and carbon management across MENA and APAC.

View all articles by Dahlia